Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
How to install roll roofing shingles.
Use the chalk line to snap a straight line vertically every 6 inches.
Snap a chalk line as a guide for the first layer roofing.
Apply roofing cement to the roof.
Cut the rolled roofing.
It also helps if you first install a layer of roofing felt.
Using a measuring tape measure 35 inches 89 cm up from.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Do not use the eaves as a guide instead because they can be uneven.
Every 5 inches make a new mark until you get to the rop of the roof.
Install peel and stick roofing in a similar manner.
Drip edge or drip cap is either plastic or sheet metal.
Mark a chalk line to identify the end of your first layer.
Plan so that no two butt joints are closer than 2 feet from each other.
To seal a plumbing vent spread roofing.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
For extra durability you may install roll roofing in two layers.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
How to do it attach first course.
Use a trowel to scoop up the roofing cement.
The strips should always be horizontal.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Repeat this on both sides of the roof.
It not only protects the roof but it also protects the fascia.
Spread the roofing cement along the.