They are galvanized steel pressed metal roofing sheet which were popular in the 1970 s 1980 s as a roofing material.
How to lay roof tiles australia.
Repair and reinforce the roof if applicable.
This is on its own a major job that can take days and require special tools.
Tiles are then laid out across the roof and clipped on.
You should have reinforced the frame of the roof earlier before.
How to tile a roof if you would prefer to read how to tile a roof and see more help please visit this link unless you found this video via my website.
Where the different sides of the roof meet.
Position the first.
Putting on the tiles.
After a section of tile was removed the timber ridge rafters and battens were inspected and checked for level.
The original battens were left to maintain structural integrity and new 70 x 35mm pine battens secured to.
Construction usually takes around 1 2 days to get a concrete or terracotta tile roof installed and 1 day for a composite tile roof.
Despite being over 40 years old this hardwood roof was still mostly in good condition.
Remove old roofing if applicable.
With straight bond the sides of tiles form straight lines from bottom to top course.
For specialist services please view the find a roofing specialist.
Removing tiles can be slow as they can be nailed or wired down.
Tiles at the edges are cut to make even lines along the hips and valleys of the roof i e.
This all depends on how big your roof is and a number of other factors our roofers provide a comprehensive roofing service.
The system of aligning tiles on the roof in relationship to each other.
They were formed into the shape of 5 tiles and coated with a bitumen coating with a fine stone aggregate embedded in the coating.