Slate roof installation guide 1 construct the roof properly.
Installation slate roof construction detail.
3 before you start do your homework.
Read about the common mistakes people make when installing.
Architects consultants slate installers and designers rave about this book.
Architectural drawings accurately illustrate flashing and roof lay out.
Take a look at the slate tile roof installation guide to gather more detailed information regarding the repair installation of slate roofs.
At cmr construction roofing we help home and business owners find ways to improve the safety beauty and dependability of their roofing system.
Here are just a few reasons why a slate roof may be the best choice for your needs.
Even more important is the overlap at the top of each slate called headlap.
Slate roof installation installing a closed valley after finishing with the open valley now we ll outline the installation of a closed valley.
Install first piece of copper flashing over bottom of furring strips.
Ihave seen 130 year old slate roofs in.
The wood strips should be approximately 3 times the thickness of the slates.
Roof construction standard traditionalroof framing is sufficient to handle the weight of standard thickness slates which are 3 16 to 1 4 inch thick.
This gold circle award winning book masterfully renders every design and installation detail to be found in slate roofing.
Let s start with roof construction.
How to install a slate roof the details roof pitch the angle of a roof not only determines what slates to use but the amount of overlap that the slate.
A closed valley detail is when slates come together and meet so you cannot see any valley flashing underneath.
Furring strips were nailed to roof with 2 5 inch hot dipped galvanized common nails.
Roof battens and gauge.
Fixing sequence with lead roll hip 1 fix 600 mm wide underlay overlapping the main underlay.
Slating terms and phrases if you are not a seasoned roofer some of the terms used for slates batten spacing or.
If your roof is steep with a pitch of.
Assume all elements of the roof assembly must last and function for at least 150 years.
4 have the correct tools.
This is 20 ounce copper.
2 finish slating as close to timber roll as possible.
Slates should overlap by at least three inches on the sides called sidelap.
3 cover the timber roll with code 6 lead strips 450 to 500 mm wide and 1 5 to 1 8 m long.
The slate nearest the hip slate must remain a full slate.