Dig a trench large enough to hold the catch basin.
Installing a gutter pop.
Cut a triangular section from.
It s much easier to join sections on the ground than to work from the top of a ladder.
Step 3 optional catch basin.
Secure it with eight pop rivets or sheet metal screws.
Project step by step 20 cutting the gutter.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
We provide a fully licensed plumber to do all your gutter.
Wrap the aluminum strip tight around the underside of the gutter.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.
Cut a starter hole in the gutter with a chisel drill or sabre saw and nibble out the finished opening with tin snips.
Form strip miter joint at corner cover the joint between two lengths of gutter at each corner with a strip miter a 3 inch wide strip of aluminum.
Pop up drains are available in an assortment of brands and sizes and package directions will provide details to aid your decision.