Use a staple gun and.
Installing roof insulation batts.
Make sure the insulation fits snugly so that there is no air space between the flooring and the insulation.
Insulation should be installed right to the eaves so the batt is 50mm over the outside wall.
The basic installation steps are the same for walls ceilings floors and roofs in wood frame houses.
Fit the insulation into the framing cavity starting at the top for walls.
Split batts to fit around electrical cables.
If you are not 100 confident with installing insulation lowe s recommends that you hire a professional.
Staple the insulation flanges securely to the sides or bottom of the joists called inset stapling.
However you need to leave an air gap of 20mm between the insulation and your roof.
In a framed roof the ceiling joists are usually spaced at 450mm centres and the pieces will fit tightly between the joists.
Cut the insulation roll or batt to fit the length of the framing cavity if necessary.
Check the joist width to determine the correct insulation batt width.
Ensure you have the right product for the application for your roof insulation installation.
Pink batts ceiling insulation is 1220 x 432mm.
Flatten the tabs against the front edge of the stud on each side of the batt.
Here s how fill all voids.
Installing right to the edges.
Unfold the mounting tab along each vertical edge of the batt.
Fit first then cut to length.
Pink batts insulation should always be cut slightly oversize to ensure a friction fit.
Fastening insulation gently press the insulation between two studs with its moisture barrier facing out toward the room.
Push batts all the way to the back of each stud space and then pull out the front edges until they re.
Lay plywood or other material across the ceiling joists in the attic to serve as temporary flooring while you install the insulation batts.
Tear the batt in.
Place the insulation with the.
Fit batts tightly around electrical cables and boxes.
Fit the insulation batts into the joists with the kraft paper vapor retarder facing against the sub floor.
7 position the batt of insulation at the outer edge of.